• Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel
  • Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel
  • Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel
  • Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel
  • Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel
  • Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel

Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel

Max.Head: >150m
Max.Capacity: >400 L/min
Driving Type: Motor
Impeller Number: Single-Stage Pump
Working Pressure: High Pressure Pump
Influent Type of Impeller: Single Suction Pump
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Durco Mark 3
Position of Pump Shaft
Horizontal Pump
Pump Casing Combined
Horizontal Split Pumps
Mounting Height
Since Irrigation Centrifugal Pumps
Impeller
Closed
Usage
Pump
AISI AISI ASTM
Flowserve, Itt
OEM Type1
Durco Mark 3
OEM Type 2
Goulds 3196
OEM Type 3
Sulzer, Nash
Transport Package
Wooden Cases, Pallet
Specification
BVQI, ISO9001-2008
Trademark
ZLT
Origin
Zibo, Shandong Province, China
HS Code
84139100
Production Capacity
1000000.00tons

Product Description

  1. Company  profile 

Zibo ZLT International Trade Co.,Ltd  was founded in 2006, and whose factory is ZIBO QINGDONG MACHINERY MANUFACTURING Co., Ltd located in Zibo city ,shandong province ,China.

*Professional Goulds 3196 and Durco parts manufacture 
*All the model include the 17'' about Goulds 3196 
* All the parts without mould cost ,include casing, impeller ,shaft , cover, bearing ,Etc. 

* Samples can be send firstly 

 2.Some model of Durco pump casing :

Part  description Size HP.  No Material
Durco Casing 1.5X1-6 DAB100 CF8M/CD4/ iron
Durco Casing 1.5X1-8 DAC100 CF8M/CD4/ iron
Durco Casing 3X1.5-6 DAD100 CF8M/CD4/ iron
Durco Casing 3X1.5-8 DAE100 CF8M/CD4/ iron
Durco Casing 3X2-8 DAF100 CF8M/CD4/ iron
Durco Casing 4X3-8(2) DAG100 CF8M/CD4/ iron
Durco Casing 2X1-10 DAH100 CF8M/CD4/ iron
Durco Casing 3X1.5-10 DAJ100 CF8M/CD4/ iron
Durco Casing 3X1.5-10A DAK100 CF8M/CD4/ iron
3.Products picture: 
Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel

4. Production -Sand casting 

Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel

Other products pictures :


Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel


 

Caft 
Clarify Process Material
Lost Wax Casting silicon colloidal moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
waterglass bonded machining
testing
Sand Casting resin sand craft moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
silicate bonded sand craft machining
testing
Lost Foam Casting   moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze,  

5. Testing 
Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel

* Zibo Qingdong machinery  had been engaged in Casting and Machining industry for more than 10 years.
 
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.

* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and cnc machining services. 
 
* Rich OEM service experience.
 
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
 
* Our Commitment & Responsiblity:
      1.Competitive Price
      2.Strict Quality Control
      3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
      4.Timely Delivery 
       5.Small Quantity Acceptable



6. Exhibition :

Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel


7.Certificate :
Sand Casting Replace Durco Pump Casing in Stainless Steel/Carbon Steel




* Usually 30 days for the mould pattern ,   the other 30 days after the sample is confirmed ok .

* Please kindly send us your drawing ,quantity ,we will quote in about 2 days . 

If any question,please kindly contact with us. 



Our web:zltgroup.en.made-in-china.com 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now