• Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
  • Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
  • Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
  • Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
  • Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
  • Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts

Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts

Max.Head: >150m
Max.Capacity: 200-300 L/min
Driving Type: Magnetic
Impeller Number: Single-Stage Pump
Working Pressure: High Pressure Pump
Influent Type of Impeller: Single Suction Pump
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
spare parts
Position of Pump Shaft
Horizontal Pump
Pump Casing Combined
Horizontal Split Pumps
Mounting Height
Since Irrigation Centrifugal Pumps
Impeller
Open
Usage
Pump
Pump Parts Delivery Time
30 Days
Pump Parts The Material
Stainless Steel ,Alloy Steel ,Bronze ,Titanium
Pump Parts The Machining
CNC Machining
Pump Parts HS Code
84139100
Pump Parts Sample
Can Be Sent Firstly
Pump Parts Dimension
6′′,8′′,10′′,13′′,15′′
Transport Package
Pump Cover Single Packed Then Put Into Carbon
Specification
CE, SGS, ISO9001-2008, BV
Trademark
ZLT
Origin
Pump Cover in Zibo, Shandong Province, China
HS Code
84139100
Production Capacity
10000

Product Description

1. Company  profile 

Zibo ZLT International Trade Co.,Ltd  was founded in 2006, and whose factory is ZIBO QINGDONG MACHINERY MANUFACTURING Co., Ltd located in Zibo city ,shandong province ,China.

*Professional  OEM parts/Pump parts manufacture
* Samples can be send firstly 

* quick delivery time 

2. Products information :

Product  Castings /pump parts  
Material SS316, SS304, CD4,Tianium,carbon steel ,alloy steel ,etc 
Manufacturing process Lost wax castings/sand casting 
Certificate GB/T 19001-2008/ ISO 9001:2008
Weight range Few grams to 100 kgs by lost wax casting , 10 tons by sand casting 
Payment terms T/T, L/C
Export port Qingdao
Referece 2D/3D, 100% as per drawing 


3. Products pictures :

Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts
4. Production - Sand casting 
Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts

Other pictures :

Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts

 

Caft 
Clarify Process Material
Lost Wax Casting silicon colloidal moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
waterglass bonded machining
testing
Sand Casting resin sand craft moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
silicate bonded sand craft machining
testing
Lost Foam Casting   moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze,  

Testing :
Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts



* Zibo Qingdong machinery (Zibo ZLT Interntional Trade Co.,Ltd ) had been engaged in Casting and Machining industry for more than 10 years.
 
*The whole production cycle is monitored by our Quality Management System ISO 9001:2008 certified.

* We now supply all forms of casting parts and cnc machining parts:  lost wax investment casting, sand casting, and cnc machining services. 
 
* Rich OEM service experience.
 
* Our products has been sold to more than 30 countries, we are very familiar with the whole markets, expecially for Europe, North America,Australia and Canada markets.
 
* Our Commitment & Responsiblity:
      1.Competitive Price
      2.Strict Quality Control
      3.Quick Response To Any Inquires,Complaint,Technical Problem,etc
      4.Timely Delivery 
5. Exhibition :
Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts

6.Certificate :

Investment Casting Stainless Steel/Carbon Steel Pump Spare Parts


* Other pump parts ,your drawings/sample is great helpful for us .

* Usually 30 days for the mould pattern ,   the other 30 days after the sample is confirmed ok .

* Please kindly send us your drawing ,quantity ,we will quote in about 2 days . 

If any question, please kindly contact with us. 




Our web:zltgroup.en.made-in-china.com 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now